Production Process & FAQ

Our Production Process

  1. Initial inquiry and quote (response within 24 hours)
  2. Pre-production sampling (7–10 days)
  3. Sample approval and order confirmation
  4. Bulk production with in-line quality inspection
  5. Final QC inspection (AQL 2.5 standard) before packing
  6. Packaging and shipment to your destination

Frequently Asked Questions

What is your minimum order quantity (MOQ)?
MOQ starts from 50 pieces per colour/style for blank t-shirts, 100 pieces for custom printed designs, and 200+ pieces for OEM branded programmes. Hoodies, polos, and uniforms typically start from 2,000 pieces.

How long does sampling take?
Pre-production samples are typically ready in 7–10 days.

Do you handle export shipping?
Yes, we have export experience with buyers in the USA, EU, Australia, Japan, and the Middle East.

How do you ensure quality?
Every order passes through three QC checkpoints — fabric inspection, in-line inspection, and final inspection — following the AQL 2.5 standard.